
A-01 · Project sheet
Sheet 01 of 02
Project
Chapel Hall
Type
Renovation
Location
Zwolle, NL
Year
2023
Area
410 m²
Client
Neighbourhood trust
Materials
Lime wash, steel trusses, oak floor, brick
The brief
The chapel had stood empty for years. A neighbourhood trust bought it as a shared hall and asked for a room that could hold a concert on Saturday and a market on Sunday, with as little moving around as possible.
The drawing
We kept the main hall empty and put everything else in one strip along the side: a foyer, a kitchen, a store for chairs and stages, an office, a green room and toilets. The entrance moved to the foyer, so people no longer walk straight onto the stage.
On site
The roof trusses were cleaned and repaired, the walls lime washed and a new oak floor laid over underfloor heating. New glazing sits inside the old window frames, so the hall stays warm without changing how it looks.
A-02 · The drawing
Sheet 02 of 02
Read the drawing.
A photo shows how a house looks. The plan shows how it works: where the light comes in, how you move from room to room and what each space is for. We publish both for every project.
Hatched band
Single line
Dashed arc
Three lines
Brass chain
Circled letter

Drawing
Photo
A-01 · Ground floor plan · 1:100
410 m²